The affected area will be from Soi Bangthong to Thairatwithaya High School and will include Soi Saithong.
Work is currently being carried out to expand Bangthong Bridge and due to this work, it is necessary for the water authority to move the main water supply pipe in the near vicinity of the bridge.
More Information: 076-319-173 or 089-856-4191


